Achieving the 30% Goal: Energy and Cost Savings Analysis of ASHRAE Standard 90.1-2010

This report documents the progress indicator (PI) process and analysis that Pacific Northwest National Laboratory (PNNL) developed to evaluate the potential energy savings from the application of ASHRAE Standard 90.1-2010 to building design and construction compared to the application of ASHRAE Standard 90.1-2004. The report describes PNNL’s EnergyPlus simulation framework, and the building prototype simulation models. The combined upgrades from ASHRAE Standard 90.1 -2004 to ASHRAE Standard 90.1-2010 are described, and consist of a total of 153 approved addenda (44 addenda to ASHRAE Standard 90.1-2007 and 109 addenda to ASHRAE Standard 90.1-2010). PNNL reviewed and considered all 153 addenda for quantitative analysis in the PI process. Fifty-three of those addenda are included in the quantitative analysis. This report provides information on the categorization of all of the addenda, a summary of the content, and a more in-depth explanation of the impact and modeling of the 53 identified addenda and their quantitative savings.

Publication Date: 
Friday, May 20, 2011