COMcheck 101 Training: HVAC General Requirements
Page 6 of 10
Hydronic Controls
Systems must have controls to sequence boiler operation. If the system only has one boiler and is larger than 500,000 Btu/h, it must have either a multistaged or modulating burner.
Three-pipe systems are not allowed.
Two-pipe changeover systems must:
- allow a dead band between changeover of at least 15°F outside air temperature,
- have controls that allow operation in one mode for at least 4 hours before changeover, and
- have controls that allow heating and cooling supply temperatures at changeover point to be no more than 30°F apart.