Materials and Equipment Information

  • Show sufficient detail on building plans or specifications to indicate conformance with the requirements of the code.
  • Materials and equipment must be installed in accordance with the manufacturer's installation instructions, and must be identified so that compliance can be determined.
  • Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided.

For example, call out the following information on the plans or specifications:

  • envelope insulation levels
  • duct insulation levels
  • high-efficiency heating equipment (especially if credit is taken for high-efficiency equipment - include the equipment efficiency, make, and model number on the plans or specifications)

Other information that should be included:

  • U-factors of fenestration products
  • size and type of apparatus and equipment, and
  • equipment and systems controls.

For blown or sprayed insulation, the initial installed thickness, the settled thickness, the coverage area, and the number of bags must be clearly posted at the job site. In attics, thickness markers must be placed at least once every 300 square feet.

Thickness markerExample of a thickness marker in an attic