State:
Florida
City:
Tampa
Enacted:
2008
Summary:
The Tampa Fast Track Review Checklist is not a rating system. It is a means whereby city staff can determine if a project meets certain sustainability criteria as to warrant a faster plan review. Some requirements include:
New and renovated municipal buildings 5,000 ft2 or larger must achieve LEED Silver.
Commercial buildings 5,000 ft2 or larger are required to comply with a third-party rating system, LEED or FGBC.
Residential and commercial buildings less than 5,000 ft2 must meet six requirements.
Other systems are evaluated on a case-by-case basis. Grants are available to help with permitting costs.
Model Policy Category:
Green Building
Incentive