Implementation of Energy Code Controls Requirements in New Commercial Buildings

This study used a three-step process to evaluate the degree to which high-impact controls requirements included in commercial energy codes are realizing their savings potential. The three-step process included: (1) interviews of commissioning agents; (2) field audits of a sample of commercial buildings to determine how well control measures are being designed, commissioned and correctly implemented; and (3) analysis of the information gathered.

Publication Date: 
Friday, March 31, 2017